USCG final environmental impact statement for Seattle Monorail Project Green Line Lake Washington Ship Canal bridge and Duwamish Waterway bridge modification / volume two appendix LL - updated conceptual design drawings and appendix MM - updated visual simulations / urban design updates A-K
Textual Record
Download as:
- Identifier
- Doc_6213
- Description
- USCG final environmental impact statement for Seattle Monorail Project Green Line Lake Washington Ship Canal bridge and Duwamish Waterway bridge modification / volume two appendix LL - updated conceptual design drawings and appendix MM - updated visual simulations / urban design updates A-K
- Extent
- c. 500 p. in various pagings : ill., maps ; 28 cm.
- Date created
- March 10 2004 No
- Series
- 1801-92: Published Documents Collection
- Location
- Box D-428
- Subject Terms
- ENVIRONMENTAL PLANNING, MASS TRANSIT, MONORAIL SYSTEM
- Citation
- Courtesy of the Seattle Municipal Archives, #Doc_6213, Series 1801-92.