USCG final environmental impact statement for Seattle Monorail Project Green Line Lake Washington Ship Canal bridge and Duwamish Waterway bridge modification / volume two appendix LL - updated conceptual design drawings and appendix MM - updated visual simulations / urban design updates A-K

Textual Record

Download as:
Identifier
Doc_6213
Description
USCG final environmental impact statement for Seattle Monorail Project Green Line Lake Washington Ship Canal bridge and Duwamish Waterway bridge modification / volume two appendix LL - updated conceptual design drawings and appendix MM - updated visual simulations / urban design updates A-K
Extent
c. 500 p. in various pagings : ill., maps ; 28 cm.
Date created
March 10 2004 No
Series
1801-92: Published Documents Collection
Location
Box D-428
Subject Terms
ENVIRONMENTAL PLANNING, MASS TRANSIT, MONORAIL SYSTEM
Citation
Courtesy of the Seattle Municipal Archives, #Doc_6213, Series 1801-92.