Skip to main content

Seattle Municipal Archives Finding Aids

Energy: Electrical, 1979-1989

 Sub-Series

Scope and Contents note

The Energy subseries documents Rice's work relating to Seattle City Light, the Bonneville Power Administration, and the Washington Public Power Supply System. Most of the Seattle City Light material deals with rates, but issues such as a customer information system, cost allocation, and the Lake Union steam plant are represented as well. Other issues covered in the files include the electrical code, joint utility billing, and conservation.

Dates

  • Creation: 1979-1989

Creator

Conditions Governing Access note

Records are open to the public.

Full Extent

From the Series: 14.8 Cubic Feet (37 boxes)

Language of Materials

From the Series: English

Repository Details

Part of the Seattle Municipal Archives Repository

Contact:
PO Box 94728
600 Fourth Avenue, Floor 3
Seattle 98124-4728 USA US