City Light Ross Dam Construction Photograph Albums

 Series
Identifier: 1204-12

Scope and Contents note

Construction of Ruby Dam, Steps One and Two, began in 1937 after City Light received three million dollars from the federal Public Works Administration to begin clearing timber from Ruby Basin. The dam was the third built by Seattle City Light as part of the Skagit River hydroelectric power project. It was renamed Ross Dam in 1939 in memory of James D. Ross, the long-time superintendent of City Light who died in March of that year. The first step of Ross Dam's construction was completed in 1940. The dam was 305 feet high and created a reservoir with a water level at 1380 feet above sea level. Ross Dam was initially constructed for storage rather than power generation.

Step Two in the construction of Ross Dam began in 1943. The dam height was to be raised to nearly 500 feet. Step Three was approved by the Federal Power Commission (FPC) in 1947 and at completion in 1949, the dam stood at 540 feet. Ross Lake, the reservoir behind the dam, rose to 1615 feet above sea level, well above the elevation of the Skagit River at the British Columbia border.

In 1950, the FPC authorized construction of Ross Powerhouse and three generating units. During 1952 to 1956, Ross Powerhouse was constructed and four generators went on-line, doubling the electrical output generated by City Light. The fourth generating unit was installed at Ross Powerhouse in 1956.

The United States Congress created Ross Lake National Recreation Area and the North Cascades National Park in 1968. In 1970, Seattle applied to the FPC for construction of a fourth step of Ross Dam, which would raise the reservoir elevation to 1725 feet. The final water level of Ross Reservoir was not settled until 1984, after lengthy negotiations with the International Joint Commission comprised of representatives from the State of Washington, City of Seattle, and British Columbia, Canada. A fourth step was authorized in 1977, but authorization was revoked in 1984 by an 80-year agreement between Seattle and British Columbia stipulating that the fourth step would not be constructed, that British Columbia would supply power to Seattle in lieu of construction, and that Seattle would pay British Columbia an amount relative to construction costs. This agreement also created the Skagit Environmental Endowment Commission, a bi-national agency who mission is to foster education about the upper Skagit River watershed.

The collection consists of nine albums illustrating the construction of Steps One, Two, and Three of Ross Dam. Included are images of construction, construction workers and materials, employees, the dam at various stages of construction, and surrounding terrain.

Prints range in size from 3x5 inches to 8x10 inches, and all are pasted in binders or albums. Prints have negative numbers, and the original negatives are part of the holdings of the Municipal Archives.

One of the more distinctive albums is Album 5, which belonged to William B. Wolfendale, Principal Engineer for Ross Dam. This album contains colorized photographs of Step One, including construction photographs as well as group portraits of those involved in the construction. Individuals pictured in this album include: Glen Smith, William B. Wolfendale, Principal Engineer, several individuals from the Federal Power Commission (including Basil Manly and R. G. Hackett), E. U. Hoffman, Mrs. Hoffman, Mrs. Manly, Ben Torpen, Engineer U.S.E.D., and officials from the General Construction Company. Interiors and exteriors of cottages at Ross Dam are also pictured. Print range: RD61 to RD370; many unnumbered prints included.

Dates

  • Creation: 1938-1948

Creator

Conditions Governing Access note

Records are open to the public.

Historical note

City Light provides electricity and electrical and conservation services to its public and private customers. It is the largest public utility in the Pacific Northwest. Public responsibility for electrical energy dates back to 1890 with creation of the Department of Lighting and Water Works. The formulation of this public utility stemmed from fear of monopolization by private companies and was reinforced by the inadequacy of those companies during the Great Fire of 1889. Unable to gain access to private water, much of the business district was burned to the ground. Citizens responded eagerly to the idea of publicly owned water and electricity, which was later encouraged as part of President Roosevelt's New Deal in the 1930s.

In 1902, Seattle voters passed a bond issue to develop hydroelectric power on the Cedar River under the administration of the Water Department. This was the nation's first municipally owned hydroelectric project. Electricity from this development began to serve customers in Seattle in 1905. A City Charter amendment in 1910 created the Lighting Department, making it a full member of the City's Board of Public Works. Under the leadership of Superintendent James D. Ross, the department developed the Skagit River hydroelectric project which began supplying power in 1924 with the completion of the Gorge Dam.

Both public and private power was supplied to Seattle until 1951 when the City purchased the local private electrical power company, the Puget Sound Power and Light Company, making the Lighting Department the sole supplier. The Boundary Project in northeastern Washington began operations in 1967 and supplied over half of City Light's power generation. By the early 21st century, approximately ten percent of City Light's income came from the sale of surplus energy to customers in the Northwest and Southwest with the remainder of City Light's financial support coming from customer revenue.

The current name of the agency was adopted in 1978 when the department was reorganized. As a municipally owned public power system, Seattle City Light is governed by elected Seattle officials. Administrative authority rests with the Superintendent and an executive team that includes the department's Chief of Staff, Service and Energy Delivery Officer, Human Resources Officer, Power Supply and Environmental Affairs Officer, and Chief Financial Officer. City Light is responsible for electrical service and streetlight service, streetlight problems, and also conservation, both residential and commercial/industrial.

City Light provides low-cost, reliable, and environmentally responsible electric power to approximately 395,000 customers in Seattle and neighboring areas, including Burien, Lake Forest Park, Normandy Park, Renton, SeaTac, Shoreline, Tukwila, and unincorporated King County. It is the ninth-largest public power system in the United States and has the lowest rates among comparably sized cities in the United States.

Full Extent

1.8 Cubic Feet

Language of Materials

English

Abstract

Photographs documenting the construction of Ross Dam on the Skagit River, 1938-1948.

General Note

Panorama of Ross Dam from High Stand, July 1939. Seattle Municipal Archives.

Processing Information note

Album 5 was unbound for preservation reasons.

Subject

Title
Guide to the Ross Dam Construction Photograph Albums 1938-1948
Author
Finding aid prepared by Anne Frantilla
Date
© 2003
Description rules
Describing Archives: A Content Standard
Language of description note
Finding aid written in English.
Sponsor
Funding for encoding this finding aid was provided through a grant awarded by the National Endowment for the Humanities.
EAD Location
http://archiveswest.orbiscascade.org/ark:/80444/xv62937

Repository Details

Part of the Seattle Municipal Archives Repository

Contact:
PO Box 94728
600 Fourth Avenue, Floor 3
Seattle 98124-4728 USA US