Box 2
Container
Contains 25 Results:
Preliminary Investigation of the Moving Steel Towers and Power Lines to Clear for the Construction of the 6th Avenue N.E. High-Level Bridge, 1957
File — Box: 2, Folder: 14
Thirty Years Experience with Wood-Pole Transmission-Line Construction, 1954
File — Box: 2, Folder: 15
Gound Fault Test Results on Allis Chalmers Oil Circuit Breaker (Type FZO-50-34F), 1962-1963
File — Box: 2, Folder: 17
Testing of Transformer Cluster Mount Brackets by Contract Construction Division, 1963
File — Box: 2, Folder: 18
An Analysis of the Cooling Air Flow Through a Large Electrical Generator, 1963
File — Box: 2, Folder: 19