Cabinet 32-4
Container
Contains 5 Results:
Municipal Street Railway Bridge and approach spans over West waterway at W Spokane St 1-62; Substructure and W approach to Bascule Bridge; Architects GA Lamb, WN Bell, Paul M Trueblood, EJ Legg, CHE; 62 drawings; 2 folders, 1926
File — Cabinet: 32-4, Folder: 1-2
Municipal Street Railway Bridge and approach spans over West waterway at W Spokane St/ Bascule Bridge Prelim- SP02; Machinery & electrical equiptment; Architect HA Jacobs; 15 drawings, 1927
File — Cabinet: 32-4, Folder: 4
Municipal Street Railway Bridge and approach spans over West waterway at W Spokane St 63-115; Substructure and W approach to Bascule Bridge; Architects WN Bell, EJ Legg, GA Lamb, Paul M. Trueblood, WD Aolfeudale; 52 drawings, 1926
File — Cabinet: 32-4, Folder: 3
Second Ave et al div #2; Concrete Viaduct; Architects GA Lamb, Paul M Trueblood, EJ Legg, CH Eldridge, S De Moss, HB Graves, H Dodge, JDH; 59 drawings, 2 folders, 1929
File — Cabinet: 32-4, Folder: 5-6