Box 1
Container
Contains 1588 Results:
Lake Washington Canal Bridges. Building Piers, Bridges and Approaches. Estimated Costs, 1912-1918
File — Box: 1, Folder: 1088
Dates:
1912-1918
Lake Washington Canal Bridges. Planning of Various Bridges, 1916-1918
File — Box: 1, Folder: 1089
Dates:
1916-1918
Lake Washington Canal Bridges. Structures and Approaches, 1912-1918
File — Box: 1, Folder: 1090
Dates:
1912-1918
Lake Washington Canal Bridges. Superstructure of Highway Bridge over Fremont Avenue, 1913-1915
File — Box: 1, Folder: 1091
Dates:
1913-1915
Alaskan Way Viaduct Extension Holgate to Hanford, 1954-1957
File — Box: 1, Folder: 83
Dates:
1954-1957
Alaskan Way Viaduct Extension Hanford - W Dakota Sts, 1956-1963
File — Box: 1, Folder: 84
Dates:
1956-1963
Alaskan Way Viaduct Fire Hydrants / Standpipes, 1965-1967
File — Box: 1, Folder: 85
Dates:
1965-1967
Alaskan Way Viaduct Extension Spokane St Ramps Design, Construction, 1957-1959
File — Box: 1, Folder: 87
Dates:
1957-1959
Alaskan Way Viaduct Extension Sly-General Design, Construction, 1952-1955
File — Box: 1, Folder: 88
Dates:
1952-1955
S Albro Place Bridge Expansion, Joint Repair and Resurfacing, -
File — Box: 1, Folder: 92
Dates:
undated
S Albro Place Bridge Expansion, Joint Repair and Resurfacing, -
File — Box: 1, Folder: 93
Dates:
undated
MI Arterial Concrete St Rehabilitation BPW 85-77, 1984-1985
File — Box: 1, Folder: 113
Dates:
1984-1985
Arterial Highway Corners Widening / Paving, etc, 1934-1939
File — Box: 1, Folder: 116
Dates:
1934-1939
Arterial Highway Corners Widening / Paving, etc, 1935-1936
File — Box: 1, Folder: 117
Dates:
1935-1936
Arterial Highway Corners Widening / Paving, etc, 1935-1936
File — Box: 1, Folder: 118
Dates:
1935-1936
Arterial Highway Corners Grading / Paving, etc, 1936-1937
File — Box: 1, Folder: 120
Dates:
1936-1937
Arterial Signal Modification Interconnect 4th s / S Dearborn, -
File — Box: 1, Folder: 127
Dates:
undated
Ashworth Ave N (126th to N 128th Streets) Watermains, etc, 1979-1979
File — Box: 1, Folder: 129
Dates:
1979
Ashworth Ave N, NW 175th St, et al Watermains and Hydrants, 1981-1982
File — Box: 1, Folder: 130
Dates:
1981-1982
Atlantic St (Rainier Ave-23rd Ave) Curb / Gutter / CBs, 1907-1907
File — Box: 1, Folder: 132
Dates:
1907
Atlantic St (1st Ave S to pt, 310 Wly) Constr Rdway to Bridge, 1902-1902
File — Box: 1, Folder: 133
Dates:
1902
Atlantic Str Terminal - Seattle Transit System Construction, 1940-1941
File — Box: 1, Folder: 134
Dates:
1940-1941
Aurora Avenue / Fremont Way, et al Channelized Traffic Islands, -
File — Box: 1, Folder: 140
Dates:
undated
Aurora Ave, et al / Aurora Bridge Construction / Misc Letters, 1925-1932
File — Box: 1, Folder: 142
Dates:
1925-1932
Aurora Ave, et al / Aurora Bridge Construction / Misc Letters, 1929-1941
File — Box: 1, Folder: 143
Dates:
1929-1941
Aurora Ave, et al / Aurora Bridge Construction / Misc Letters, 1931-1940
File — Box: 1, Folder: 144
Dates:
1931-1940
Aurora Ave N Median Barriers / Pedestrian Facilities, 1978-1980
File — Box: 1, Folder: 148
Dates:
1978-1980
Aurora Avenue Pedestrian Underpass - Condemnation included, -
File — Box: 1, Folder: 150
Dates:
undated
Aurora Avenue Pedestrian Overpass at N 102nd St, 1959 - 1960
File — Box: 1, Folder: 151
Dates:
1959-1960
Aurora Ave N St N 41st St Pedestrian Overpass Repair, 1974-1975
File — Box: 1, Folder: 152
Dates:
1974-1975
Aurora Avenue, et al Repair and Resurfacing, 1948 - 1949
File — Box: 1, Folder: 155
Dates:
1948-1949
Aurora Avenue, et al Safety Lighting System, 1950 - 1953
File — Box: 1, Folder: 159
Dates:
1950-1953
Aurora Ave N (Denny Way / Aurora Bridge) Undergrounding, 1970-1975
File — Box: 1, Folder: 167
Dates:
1970-1975
Ballard Avenue NW Street Improvements (NW Dock Place to NW Market St), 1977 - 1977
File — Box: 1, Folder: 175
Dates:
1977
Ballard Ave NW and 26th Ave NW Street Tree Planting, 1972-1973
File — Box: 1, Folder: 179
Dates:
1972-1973
Ballard Ave NW, et al Concrete Walk Replacement, 1972-1973
File — Box: 1, Folder: 180
Dates:
1972-1973
Ballard Bascule Bridge / Approaches and Fremont Bascule Bridge Cleaning / Painting, 1971-1973
File — Box: 1, Folder: 181
Dates:
1971-1973
Ballard Bridge Pier Protection / Removal / Reconstruction, -
File — Box: 1, Folder: 183
Dates:
undated
Ballard Bridge Change Orders, Construction, etc, 1938-1941
File — Box: 1, Folder: 188
Dates:
1938-1941
Ballard Bridge Rehabilitation of Electrical Control, Timber / Pile Protection, 1940-1940
File — Box: 1, Folder: 191
Dates:
1940
Ballard Bascule Bridge and Approaches Cleaning / Repairing, -
File — Box: 1, Folder: 195
Dates:
undated
W Barton Street (8th SW to 21st SW) WPA Project Grading, etc, 1935-1936
File — Box: 1, Folder: 204
Dates:
1935-1936
CBD Street Light Poles Repair / Replacement Letters, 1982-1982
File — Box: 1, Folder: 453
Dates:
1982
Central Business District Exclusive Transit Lanes, etc, 1974-1975
File — Box: 1, Folder: 454
Dates:
1974-1975
Central Business District Exclusive Transit Lanes, 1976-1983
File — Box: 1, Folder: 455
Dates:
1976-1983
Charles Street Engineering Shop Building Improvements, 1946-1953
File — Box: 1, Folder: 463
Dates:
1946-1953
Charles St Center Site Expansion and Condemnation, 1962-1973
File — Box: 1, Folder: 468
Dates:
1962-1973
W Charlestown St and 39th Ave SW Constr Standpipe, 1925-1927
File — Box: 1, Folder: 469
Dates:
1925-1927
Cherry St (North Side) Reconstr Pavement / Cw, 1944-1945
File — Box: 1, Folder: 475
Dates:
1944-1945
E Cherry St, et al Remove Tracks / Fastenings, et al, 1942-1942
File — Box: 1, Folder: 479
Dates:
1942
Chief Seattle Monument (Cedar St / 5th Ave / Denny Way) Constr Foundation, 1908-1909
File — Box: 1, Folder: 481
Dates:
1908-1909
Chilberg Ave SW Sewer Rehab Estimates and Letters, 1984-1985
File — Box: 1, Folder: 483
Dates:
1984-1985
Civic Auditorium Recreation Field Repair Regrade, 1935-1946
File — Box: 1, Folder: 489
Dates:
1935-1946
College St Sewer Relief Civil Works Adm, Proj #608, 1933-1933
File — Box: 1, Folder: 498
Dates:
1933
Columbia City Phase 2 Street Improvements Letters, 1981-1984
File — Box: 1, Folder: 505
Dates:
1981-1984
Columbia City Hillman S Oregon Street Improvements (Paving, etc) Letters, 1984-1984
File — Box: 1, Folder: 506
Dates:
1984
Connecticut St Dredging St Trunk Sewer Outfall, 1936-1937
File — Box: 1, Folder: 518
Dates:
1936-1937
Connecticut St Connection Rpr by Municipality of Metro, 1975-1975
File — Box: 1, Folder: 519
Dates:
1975
Connecticut St Connection City's Disapproval, Preliminary Design, 1969-1972
File — Box: 1, Folder: 526
Dates:
1969-1972
Connecticut Street Connection Preliminary Planning, 1962-1968
File — Box: 1, Folder: 527
Dates:
1962-1968
S Connecticut St, et al Paving, etc, Final Environmental Statement, 1972-1976
File — Box: 1, Folder: 533
Dates:
1972-1976
Court House Tunnel (4th Ave / Yesler Way Court House Basement) Constr, 1915-1917
File — Box: 1, Folder: 541
Dates:
1915-1917
Delridge Way Pedestrian Overpass Design and Construction, 1957-1960
File — Box: 1, Folder: 573
Dates:
1957-1960
Denny Way et al Widening / Sig Modernization, Letters, Estimates, -
File — Box: 1, Folder: 585
Dates:
undated