Cedar Falls Power Plant Construction Records
Scope and Contents note
Records relating to the development and construction of the Cedar Falls Power Plant. Includes correspondence, specifications, contracts, reports, estimates of work completed, maps and drawings, and test results.
Dates
- Creation: 1898-1932
Creator
- Seattle (Wash.). Engineering Dept. (Organization)
Conditions Governing Access
Records are open to the public.
Historical Note
The Engineering Department (SED) maintained the City's streets and bridges, designed and oversaw construction of public works projects, provided traffic and transportation planning, and operated the sewer and solid waste utility. The position of City Surveyor was created in 1873 to survey the City, establish boundaries and street grades, and administer condemnation processes. This position was renamed City Engineer in 1890. In 1931 the Engineering Department absorbed part of the Department of Public Utilities and in 1936 it assumed the responsibilities of the Department of Streets and Sewers and the Traffic Department. In 1997, the water, solid waste, drainage, and wastewater utilities from the Engineering and Water departments were merged with the Engineering Services Division of SED and the Customer Service Call Center and Construction Engineering Sections of City Light to form Seattle Public Utilities. The traffic and transportation functions of the Engineering Department were consolidated in the Seattle Transportation Department.
Extent
0.8 Cubic Feet
Language of Materials
English
Abstract
Records relating to the development and construction of the Cedar Falls Power Plant.
- Title
- Guide to the Cedar Falls Power Plant Construction Records
- Date
- 2022
- Description rules
- Describing Archives: A Content Standard
- EAD Location
- https://archiveswest.orbiscascade.org/ark:80444/xv815106
Repository Details
Part of the Seattle Municipal Archives Repository